P5知识点讲解-业绩指标 (3)

ACCA P5考试:PERFORMANCE INDICATORS

For example, consider a passenger train company called TTTE: 1. Title of performance measure

Punctuality (the percentage of trains arriving at their destination on time).

2. Purpose of performance measure

TTTE’s strategic objective is to provide comfortable, reliable and punctual services to passengers. TTTE competes with other train companies, cars, buses and airlines. Punctuality is seen as a key competitive lever and therefore must be measured.

3. Other performance measures affected

Safety – safety checks and speed limits will take priority over punctuality
Cleanliness – it might be necessary to occasionally reduce cleaning to keep to the timetable.
Energy consumption running a train faster than normal (though within speed limits) will cause higher fuel consumption but punctuality takes precedence.

4. Who is held responsible?

Operations director.

5. Source data, measurement and calculation of the measure.

The duty manager at each station is responsible for logging the arrivals time of each train. A five-minute margin is allowed ie a train is logged ‘on time’ if it is no later than 5 minutes after the advertised time. Beyond five minutes the actual time by which the train is late is logged. Results will be calculated in percentage bands: on time, up to 15 minutes late, >15–30 minutes late, >30 minutes – one hour late, >one hour late, and so on.

6. Investigations and explanations

While logging late arrivals, station duty managers should also note the cause where possible. The operations director must collate this information

我要纠错】 责任编辑:小莹子
打开APP 订阅最新报考消息

报考指南

今日热搜

热点推荐

热销好课

acca辅导课程

ACCA精品录播班

Get学霸同款

精品好课免费试听

ACCA-MA免费试听!

ACCA-MA免费试听!

申请购课优惠

正保会计网校ACCA

截图保存到相册

微信识别二维码

申请千元优惠

有奖原创征稿
客服 首页
取消
复制链接,粘贴给您的好友

复制链接,在微信、QQ等聊天窗口即可将此信息分享给朋友